S/N | Year | Project Title | Client | Main Contractor | Scope of Works | Status / Expected Completion | Project Photo |
---|---|---|---|---|---|---|---|
1 | 2011 | Rehabilitation of Existing Sewer Pipeline Al Sarooj Area – Al Ain City | ADSSC Al Ain | Tamas Projects | Rehabilitation Works of 250mm diameter sewer line Including; Flow Control, Over pumping, and Cleaning followed by Inspection by CCTV and Rehabilitation of pipe by CIPP (cured in place pipe) using UV curing technology. As per ADSSC specifications and standards. | June 2011 | |
2 | 2012 | Construction works associated with rehabilitation & replacement of existing sewer lines in Abu Dhabi Part 3 | ADSSC – Abu Dhabi Sewerage Service Company | MACE – Mechanical And Civil Engineering Contractors Company (LLC) | Rehabilitation Works of existing network of pipes ranging from 150mm to 300mm in diameter, Including; Flow Control, Over pumping, and Cleaning followed by Inspection by CCTV and Rehabilitation of pipes by CIPP using UV curing technology. As per ADSSC specifications and standards. | 1st December 2014 | |
3 | 2012 | Construction works associated with rehabilitation & replacement of existing sewer lines in Abu Dhabi & Main Land Part 2 | ADSSC – Abu Dhabi Sewerage Service Company | Al Salmeen General Contracting Est. | Rehabilitation Works of existing network of pipes ranging from 150mm to 300mm in diameter, Including; Flow Control, Over pumping, and Cleaning followed by Inspection by CCTV and Rehabilitation of pipes by CIPP using UV curing technology in addition to local repair (patch repair). As per ADSSC specifications and standards. | 10th December 2015 | |
4 | 2012 | Construction works associated with rehabilitation & replacement of existing sewer lines in Abu Dhabi & Main Land Part 2 – Manhole Rehabilitation | ADSSC – Abu Dhabi Sewerage Service Company | Al Salmeen General Contracting Est. | The scope of work comprises of manhole rehabilitation. ADPS had provided all the required human resources, equipment and materials necessary to carry out the subcontract works. | 11th December 2015 | |
5 | 2012 | Khalifa Port and Industrial Zone Contract 1000-209 Offshore Civil and Buildings | Khalifa Port and Industrial Zone | Al Jaber Transport & General Contracting LLC / Ed. Zublin AG Abu Dhabi | Rehabilitation Works of existing network of pipes ranging from 150mm to 500mm in diameter, Including; Flow Control, Over pumping, and Cleaning followed by Inspection by CCTV and Rehabilitation of pipes by CIPP using UV curing technology. As per ADSSC specifications and standards. | January 2013 | |
6 | 2014 | CCTV Survey & Deflection Test for Storm Water Drainage Lines at Emirati Housing Phase I - Yas Island | Royal Group | Al Jaber Transport & General Contracting LLC (Roads Division) | The scope of work mainly comprises of sewer cleaning, deflection test and inspection survey. | July 2014 | |
7 | 2014 | Anomalies Rectification in Al Dana Outfall for Al Raha Beach Development (Storm water / Under water repair of joints of pipes of 1.80 meter diameter) | Abu Dhabi Municipality | Al Raha Integrated Facilities Management | A) Supply & install sealing sleeve DN 2400mm (7 Nos.) at the specified anomalies. (Under water condition. B) Provide diving services with videography for removal of marine growth on gate, connect hydraulic hose and install stopper block (30 Nos.) | November 2014 | |
8 | 2014 | Emergency Repair Works for 600mm diameter Storm Water Line in Al Khail Road, Dubai Pressure Line. | Dubai Municipality | Mabani Delma General Contracting Co. (LLC) | Rehabilitation Works of 600mm diameter Storm Water Pressure Line Including; Flow Control, Over pumping, and Cleaning followed by Inspection by CCTV and Rehabilitation of pipe by CIPP (cured in place pipe) using UV curing technology. As per Dubai Municipality Specs & Standards. | November 2014 | |
9 | 2014 | Rehabilitation of Storm Water Pipelines 300 mm & 500 mm dia. at Al Ras Al Akhdar & Baynoonah Street (Patch Work & CIPP) | Abu Dhabi Municipality | Al Naboodah National Contracting Group LLC | Rehabilitation of storm water drain pipelines, 300mm dia and 500mm dia using CIPP using UV curing technology and patch repair method including, but not limited to; ste-up, cleaning, pre-survey, post-survey by CCTV and leak testing of pipelines; with providing all the required human resources, equipments and materials necessary to carry out the subcontract works. | 2014 | |
10 | 2015 | Rehabilitation of Irrigation A.C. Pipeline (600 mm dia.) at Salam Street | Abu Dhabi Municipality | Royal Gardens Agricultural Contracting L.L.C. | Rehabilitation of Irrigation (600 mm dia) pipeline using CIPP using UV curing technology and supply and fixing of End-seal with providing all the required human resources, equipments and materials necessary to carry out the subcontract works. | December 2015 | |
11 | 2015 | CCTV and CIPP Repair works for Sewer lines | Khalifa Industrial Zone | Ghantoot Transport & General Contracting L.L.C. | Rehabilitation Works of existing network of pipes ranging from 150mm to 300mm in diameter, Including; Flow Control, Over pumping, and Cleaning followed by Inspection by CCTV and Rehabilitation of pipes by CIPP using UV curing technology. As per ADSSC specifications and standards. | 2015 | |
12 | 2015 | Rehabilitation Work to Repair of V01 Pipeline (STEP-LS 01) at Abu Dhabi Golf Club (Saada Street) | ADSSC - Abu Dhabi Sewerage Service Company | Ed. Zublin AG Abu Dhabi | Rehabilitation Works of 300mm diameter sewer line Including; Flow Control, Over pumping, and Cleaning followed by Inspection by CCTV and Rehabilitation of pipe by CIPP (cured in place pipe) using UV curing technology. As per ADSSC specifications and standards. | September 2015 | |
13 | 2015 | SAS-02-C-W00-C-00 - Ground Water Level Mitigation is Sas Al Nakhl | ADSSC - Abu Dhabi Sewerage Service Company | ADMAC | The scope of work is to carry out patch work to repair leaks in 700 mm dia sewage OD pipes in two different locations. | December 2015 | |
14 | 2015 | CMW-11021-C005 - Infrastructure Works for Officers Villas Project at Abu Dhabi Gates - PA 097 | ADSSC - Abu Dhabi Sewerage Service Company | Bin Hafeez General Contracting Est. | Rehabilitation of pipeline using CIPP using UV curing technology with providing all the required human resources, equipments and materials necessary to carry out the subcontract works. | September 2015 | |
15 | 2015 | Construction of Trunk Sewerage & TSE Infrastructure – Part 2, Al Masoudi Area | ADSSC - Abu Dhabi Sewerage Service Company (Al Ain) | MACE – Mechanical And Civil Engineering Contractors Company (LLC) | Rehabilitation Works of existing network of pipes ranging from 150mm to 250mm in diameter, Including; Flow Control, Over pumping, and Cleaning followed by Inspection by CCTV and Rehabilitation of pipes by CIPP using UV curing technology. As per ADSSC specifications and standards. | December 2016 | |
16 | 2016 | Cleaning, CCTV Survey for Irrigation lines at Zabeel 1 | Dubai Municipality | Dutco Belfour Beatty L.L.C | a) Cleaning of Irrigation lines (800 mm dia & 500 mm dia GRP) using high pressure jetting. (Approx. 700 m length). (b) Removal of debris and pump into client’s trucks (c) After cleaning all the lines, carry out CCTV Inspection Survey. | 2016 | |
17 | 2016 | Joint Sealing Works for Sewer and Irrigation Network | Dubai Municipality | Dutco Belfour Beatty L.L.C | a) To provide Joint seal for Pipe DN 1196mm Irrigation Pipeline including necessary investigation, mobilization & demobilization. (b) To provide Joint seal for Pipe DN 996mm Irrigation Pipeline including necessary investigation, mobilization & demobilization. (c) To provide Joint seal for Pipe DN 1000mm Irrigation Pipeline including necessary investigation, mobilization & demobilization. | February 2016 | |
18 | 2016 | TSE Leak @ Road 2 0– J.LT, Dubai | Dubai Municipality | Arabtec Engineering Services LLC | The scope of work is to rehabilitate 35.0m length GRP Pressure pipe (250mm dia.) at Jumeirah Lake Towers, in Dubai using PRIMUS Technology for the first time in UAE using slip lining. | May 2016 | |
19 | 2016 | Supply and Installation Internal Seals (3 Nos.) for Sewerage Gravity Line (uPVC 200 mm dia) at Dubai Waterfront | Dubai Municipality | Wade Adams | a) To carry out Cleaning, Inspection Survey using CCTV camera for 200 mm dia uPVC sewerage line including submission of report. (b) To provide and install internal mechanical sealing sleeve (200 mm dia) supplied from Germany, using various special equipment like CCTV camera system, Packer with compressor etc. complete. (Provisional quantity) | 2016 | |
20 | 2017 | Cleaning, CCTV Survey and Joint Sealing Works for Sewer Network | Mahwi Military Camp / Mahwi Military School | Mahwi Military Camp / Mahwi Military School | The scope of work is lining of existing network (100mm and 150 mm diameter) of approximate 970m length), the entire tunnel strom pipes for Al Shindagha Tunnel and confirm the rectification works with pre and post CCTV survey. | March 2017 | |
21 | 2016 | M 1008/3 – Maintenance of Al Shindagha Tunnel | Road and Transport Authority (RTA) | Al Shirawi Facilities Management LLC | The scope of work is lining of existing network (100mm and 150 mm dia) of approximate 970m length), the entire tunnel drainage pipes for Al Shindagha Tunnel and confirm the rectification works wth CCTV survey after the lining works. | Arpril 2017 | |
22 | 2017 | M-13/20 Trunk Main Works - Dubai | Al Marwan | Al Marwan (Main Contractor) | Repair of a problematic pipe 1 meter in diameter 12 meter underground which is a main trunk pipe connecting the sewer network of a very big area such as Jumairah Golf Estate, Jumairah Park, Jumairah Triangle & Discovery Gardens in Dubai (highly populated area) to the Sewerage Treatment Plant (STP). | October 2017 |